Batteries News

Lithium South Completes 400 Meter Pumping Well at Alba Sabrina

lithium pumping well

Lithium South Completes 400 Meter Pumping Well at Alba Sabrina.

Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) Lithium South Development is pleased to announce the completion of the first pumping well at the 2,089-hectare Alba Sabrina claim block located in Salta Province, Argentina.  The Alba Sabrina claim is the largest of the five, salar located claim blocks which total 3,287-hectares of the 5,687-hectare Hombre Muerto North Lithium Project (HMN Lithium Project) package.  Pumping well PW23-AS-02 has been completed to 400 meters of depth and has encountered sand layers as the dominant texture throughout.  PW23 AS-02 has been piped and graveled in preparation for long term pumping tests, with a screen length of 207 meters.

State-of-the-art down the hole geophysics has been completed by Zelandez (Salta, Argentina), a provider of specialized lithium brine technology. A profile of the well was completed and provides valuable insight into the hole potential. Test work completed by Zelandez includes the measurement of conductivity and temperature of well fluid, well caliber measurement, resistivity measurement, radioactivity measurement, ultrasonic wave measurement and nuclear magnetic resonance of sediment rock/fluid.

Based on this test work, total porosity averaged 21% ranging from 1% to 45%.  The Specific Yield throughout the profile averaged 7%, with maximum values of up to 33%. Based on this information, the technical team plans to install a high-capacity pump capable of extracting brine at a rate of between 40 and 50 liters per second. Hole PW23-AS02 is in a key location and could provide substantial brine for production throughput.

Adrian Hobkirk, CEO at Lithium South Development, said:

We are excited to announce the successful drill completion of pumping well PW23-AS-02 to 400 meters of depth.

“The geophysical profile conducted by Zelandez confirms the exceptional qualities of this hole location. Once the high-capacity pump test is complete, the Company is poised to capitalize on the potential of this claim block.”

The technical and scientific information in this press release was reviewed and approved by Mr. William Feyerabend, CPG, a consulting geologist, and a Qualified Person under National Instrument 43-101, who also participated in its production.

READ the latest Batteries News shaping the battery market

Lithium South Completes 400 Meter Pumping Well at Alba Sabrina. source

batteries news